Arizona Metals hits massive sulphide at Kay mine project

Infomine

Drilling has intersected massive sulphide mineralisation at the South zone of Arizona Metals’ (TSXV: AMC) Kay mine property, about 69 km north of Phoenix and adjacent to Black Canyon City in central Arizona’s Yavapai County.

Highlights from the drill program included drill hole KM-20-10, which intersected 4.9 metres grading 2.16 grams gold per tonne, 24.9 grams silver per tonne, 2.39% copper, 0.31% lead, and 3.27% zinc, (for 6.24% copper-equivalent), starting from 480 metres downhole.

The hole also intersected a high-grade core of 3 metres grading 2.42 grams gold, 28.2 grams silver, 3.66 % copper, 0.32% lead, and 3.16% zinc (for 7.78% copper-equivalent).

In 2017, Silver Spruce Resources acquired the property

“KM-20-10 is a trunk hole designed to test the South zone of the deposit at about the 500 metres deep level,” Marc Pais, the company’s president and CEO said in an interview. “Historic resources at the mine are split between the South and North zones.”

The company, he added, has already started branching off the hole and has completed hole KM-20-10a, which is currently being assayed. Hole KM-20-10b is presently being drilled, with the company planning to add more branch holes in the area.

“The benefit to us is that it increases the speed of drilling because we don’t have to drill down 500 metres each time,” Pais said. “Instead, we can fan out from the drill hole, which saves us time as well as money and also improves the accuracy at depth.”

Hole KM-20-10 is located about 40 metres below the 1,500-foot level of historic underground exploration drifts and 80 metres above hole KM-20-09, which intersected 4.18 grams gold, 41.7 grams silver, 0.12% copper, 0.82% lead, and 8.02% zinc (6.1 metres grading 7.8 grams gold-equivalent).

The phase 1 drill program began in January but was shut down in March due to the covid-19 outbreak, Pais said.

Drilling then resumed at the end of May with the current drill results representing the resumption of the phase 1 program.

“We completed nine drill holes between January and March, with hole number 10 now part of the re-start,” Pais said. “Core samples from holes 11 and 12 are at the lab and hole 13 is currently being drilled between the North and South zones and is also going to serve as a trunk hole.”

Massive sulphide mineralization in core samples from hole KM-20-10, assays released June 29, 2020. Photo Credit: Arizona Metals.

The company has two drills operating at the property, with the potential for a third, he said. Arizona Metals has also identified two drill targets to the west of the Kay mine, one about 500 metres west and the other about 1,000 metres west, and are currently working on securing drill permits. The plan is to start drilling them towards the end of the year.

The phase 1 program will cover around 7,000 metres in total, of which about 3,000 metres were drilled before the shutdown, with the results from phase 1 to be used to inform the next program of drilling.

“Once we have more core and representative data, we plan to undertake …read more

Source:: Infomine